owner: gmikcon status: draft last_reviewed: 2026-05-09 review_interval: 90d confidence: medium
source_of_truth: project-policy
Freshness Checks
The documentation server should eventually report these conditions:
- Markdown documents missing required frontmatter.
- Documents past their
review_interval.
- Inventory records missing required fields.
- Inventory records pointing to missing docs.
- Public traffic routes without linked services.
- Services marked public without a traffic route.
- Virtual machines without a hypervisor host.
- Broken relative links.
- Critical services without runbooks.
- Backup policies without a last restore test.